.avif)
The laboratory facility laid the foundation for the transition from groundbreaking innovations to commercially viable technology. Today it is used to run test series for industrial customers.
Read more in the CASE study.
90%
Carbon Recovery
>95%
Electrical Efficiency
.jpg)
The pilot plant marked the step from proof of concept to proof of plant in an industrially relevant environment. It combines pre-conversion, plasma reforming, gas cleaning and automated control in a fully integrated system that produces on-spec syngas from real mixed waste and CO₂. Today, it is used to run extensive test campaigns, generating valuable data on the path to commercial-scale plants.
Read more in the CASE study.
50 kW
Electrical Capacity
up to 10 kg/h
Waste
.avif)
Cyclize designs, builds and operates a containerized plasma reforming pilot plant in Schwedt and runs a feedstock qualification programme in Stuttgart. The team leads process and plant design, plasma reformer development, automation and data analysis
Read more in the CASE study.
> 3,000 h
Operation Time
2026
Project Deployment

Cyclize is in preparation to kick-off planning and building a first-of-a-kind (FOAK) plant at industrial scale. The FOAK plant will be located in Germany and marks the first step of commercializing our technology.
2028
Project Deployment
300 kg/h
Waste Recycling Capacity
4,500 tons
CO₂ Recycled per Year
.avif)
The first 10 MW industrial plant is Cyclize’s full-scale reference for continuous commercial operation. It translates the proven plasma process into a multi-line industrial facility. As the blueprint for subsequent plants across major chemical clusters, it is intended to demonstrate long-term reliability, on-spec syngas delivery and attractive unit economics at true commercial scale.
2031
Project Deployment
3,000 kg/h
Waste Recycling Capacity
70M m³/y
Syngas Production